The short answer: For a typical Dallas Fort Worth home, the physical work of removing a load bearing wall and installing the new beam takes about 2 to 5 working days. Finishing work such as drywall, paint, and flooring repair adds another 1 to 2 weeks. But the full project, from first phone call to a finished open space, usually runs 4 to 8 weeks, because engineering, permitting, and material lead times happen before anyone swings a hammer.
That gap between “a few days” and “a few weeks” is where most homeowners get surprised. A contractor says the demo takes three days, then the project stretches into the next month, and it feels like someone changed the story. Nobody did. They were just describing different parts of the same process.
This guide lays out the whole timeline, phase by phase, explains what makes it shorter or longer, and gives you a realistic picture for a Dallas Fort Worth home so you can plan around it.
The full timeline at a glance
| Phase | What happens | Typical time |
|---|---|---|
| 1. Consultation and site visit | Contractor and engineer see the wall in person | 1 to 7 days to schedule, 1 to 2 hours on site |
| 2. Engineering and design | Loads calculated, beam and posts specified, drawings or letter prepared | 3 days to 2 weeks |
| 3. Permit application and review | Submitted to the city, reviewed, approved | About 1 to 3 weeks, depending on city |
| 4. Materials and scheduling | Beam ordered, crew scheduled | 3 days to 2 weeks (steel and custom beams can take longer) |
| 5. Construction | Shoring, demolition, beam install, posts, connections | 2 to 5 working days |
| 6. Inspection | City inspects the structural work | 1 to 5 days to schedule |
| 7. Finishing | Drywall, texture, paint, flooring patches, trim | 1 to 2 weeks |
| Total start to finish | About 4 to 8 weeks |
These are typical ranges, not promises. Your timeline depends on your home, your city, and how quickly decisions get made. Let’s go through each phase so you can see where time actually goes.
Phase 1: Consultation and site visit (a few days)
Everything begins with someone looking at your wall in person. Scheduling this visit is usually quick, often within the week, and the visit itself runs an hour or two.
This is also the stage where you learn the most important fact about your project: whether the wall is really load bearing, and how complicated the job will be. If you want to understand your wall before calling anyone, our guides on how to tell if a wall is load bearing and warning signs your wall might be load bearing are a good place to start.
How you can speed this up: Clear access to the attic and crawlspace ahead of time, and have any old plans or remodel paperwork ready.
Phase 2: Engineering and design (3 days to 2 weeks)
After the site visit, the structural engineer calculates the loads and designs the replacement beam and posts. Simple, single story projects with a short span can move quickly. Two story homes, long spans, unusual framing, or foundation questions take longer.
What the engineer is actually doing during this time is covered in detail in what a structural engineer actually checks before wall removal. The short version: they trace the load from the roof to the foundation and design everything in between.
What slows this phase down:
- Missing or inaccurate information about the existing framing
- Foundation concerns that need extra evaluation
- Changes to the scope halfway through (for example, deciding to remove a second wall)
- A busy engineer’s calendar
How you can speed this up: Decide on the final layout before engineering starts. Every change after that restarts part of the process.
Phase 3: Permit application and review (about 1 to 3 weeks)
This is the phase homeowners underestimate most, and it is also the one the contractor cannot fully control. The engineered documents get submitted to the city, and the city reviews them on its own schedule.
In Dallas, straightforward residential applications are often reviewed within a week or two, though busy periods stretch that. Fort Worth has its own system and review timing, which we compare in Fort Worth vs. Dallas wall removal permits. Other DFW cities run on their own timelines as well, and review times can change with workload, so treat any number as a general guide, not a guarantee.
For the full picture on requirements, read do you need a permit to remove a load bearing wall in Dallas. And if you are wondering whether you can skip this step to save time, read what happens if you remove a load bearing wall without a permit in Texas first. Skipping the permit might save two weeks now and cost you far more later.
What slows this phase down:
- Incomplete applications
- City requests for corrections or additional information
- Seasonal permit backlogs
How you can speed this up: Work with a contractor who submits complete, correct applications the first time. Rework is the most common cause of delays here.
Phase 4: Materials and scheduling (3 days to 2 weeks)
Once the design is set, the beam gets ordered and the crew gets scheduled.
LVL beams are often available fairly quickly from local suppliers, though long or heavy members may need to be ordered in. Steel beams may need to be fabricated, which can add time, especially for custom lengths or connection plates. Our comparison of LVL vs. steel beam cost goes into how each option affects your budget and schedule.
Some contractors order materials while the permit is being reviewed. That is a smart way to save time, as long as the design is final and the homeowner understands the order is made at their own risk if the permit comes back with changes.
Phase 5: Construction (2 to 5 working days)
This is the part everyone pictures when they ask how long the project takes, and it is usually the shortest phase. A typical sequence looks like this:
Day 1: Preparation and shoring. The work area is protected, utilities in or near the wall are identified and rerouted or shut off as needed, and temporary shoring walls go up to carry the load above.
Day 1 or 2: Demolition and beam installation. The old wall comes out, the new beam is lifted into place, posts are set, and connections are made. This is the most visible part of the project, and on a simple single story wall it can happen in a day.
Day 2 or 3: Securing and checking. Connections are completed and checked, load is transferred to the new beam, and the shoring is removed once the structure is carrying itself.
Days 3 to 5: Rough cleanup and prep for inspection. Debris is hauled away and the structural work is left open and accessible for the inspector.
What makes construction take longer:
- A two story home, which often needs more extensive shoring and a heavier beam (see single story vs. two story costs in DFW)
- Long spans that need larger or multiple beams
- Rerouting plumbing, electrical, gas, or ductwork
- New footings or foundation work under the posts
- Surprises behind the drywall, which we discuss in hidden costs of load bearing wall removal
- Pier and beam crawlspaces that need added support before the posts can land
What makes construction faster: A short span, a single story, clear access, no utilities in the wall, and a plan that was thoroughly engineered up front.
Phase 6: Inspection (1 to 5 days to schedule)
After the structural work is complete, and before it gets covered up, the city inspects it. Scheduling is usually quick, but it depends on the city and the season. The inspector verifies that the beam, posts, and connections match the approved plans.
If everything matches, you get the green light to close the walls. If something needs correction, it gets fixed and re inspected, which can add a few days. This is another reason a carefully built project moves faster overall. Clean work passes the first time.
Phase 7: Finishing (1 to 2 weeks)
Once the structure is approved, the space needs to be made to look like it was always an open room.
This phase typically includes:
- Drywall around the new beam or ceiling
- Texture and paint matching
- Patching or matching flooring where the wall used to stand
- Trim, baseboards, and any lighting or electrical changes
- Final cleanup
How long this takes depends on how much finish work you want. Patching a small area and repainting one room is quick. Re doing a full kitchen and living area floor or ceiling to get a seamless look takes longer.
If you are planning a larger open concept makeover, it is smart to bundle the finish work into the same schedule so your contractors are not working around each other.
What changes the timeline most
If you want to estimate your own project, these are the biggest factors.
1. Number of stories. Two story homes require more engineering, heavier beams, and more careful shoring.
2. Span length. A 6 foot opening is far simpler than a 20 foot one.
3. What is in the wall. Plumbing stacks, gas lines, electrical panels, and HVAC runs add rerouting time and sometimes specialist trades.
4. Foundation conditions. Slab versus pier and beam, existing movement, and soil issues all affect how new post loads are supported. If your home has a history of movement, see foundation movement and load bearing walls in Dallas. Sometimes repairs through structural remediation need to happen first.
5. Age of the home. Older homes often have surprises in the framing, or earlier remodels that were never documented. Signs like sagging floors in older Dallas homes or cracked drywall that might be structural are worth having checked before you commit to a schedule.
6. City and permit timing. Different cities, different queues.
7. How fast you decide. Honestly, this one is underrated. Waiting a week to pick a beam finish or choose flooring can slow a project more than any construction issue.
Realistic timelines by project type
These examples are illustrative, not guarantees.
Simple single story wall, short span, no utilities, slab foundation:
Engineering and permitting: 2 to 4 weeks. Construction: 2 to 3 days. Finishing: about a week. Total: roughly 4 to 6 weeks.
Single story wall with plumbing or electrical in it:
Same as above, plus a few extra days for rerouting. Total: roughly 5 to 7 weeks.
Two story home, wall supporting the floor above:
More involved engineering and shoring. Construction: 3 to 5 days. Total: roughly 6 to 8 weeks.
Long span, multiple walls, or foundation work:
Engineering and permitting can stretch, and construction runs a week or more. Total: often 8 to 12 weeks.
Older pier and beam home with support upgrades:
Add time for crawlspace work before the main wall is touched. Total: often 6 to 10 weeks.
Can the project be done faster?
Sometimes, but be careful what you trade for speed.
Safe ways to save time:
- Make final layout decisions before engineering begins
- Choose finishes and materials early
- Ask your contractor to order long lead items as soon as the design is final
- Be available for site visits and sign offs
- Keep access to the work area clear
Ways that look faster but create risk:
- Skipping engineering or guessing at beam sizes
- Starting work before the permit is approved
- Cutting corners on shoring
- Rushing inspection and closing walls early
Rushing the wrong parts is how projects end up taking longer, because problems found later have to be torn out and redone. If you want to understand why the careful route protects you, read is it safe to remove a load bearing wall.
Can you live in the house during the work?
In most cases, yes. Expect dust, noise, and limited access to the affected area for a few days. Your contractor should seal off the work zone, protect floors, and tell you which rooms and utilities will be affected. If the wall is between your kitchen and living room, plan on simple meals for a few days.
Can the timeline affect cost?
It can. Longer projects mean more labor days, more equipment time, and more chances for added costs. On the flip side, rushing usually costs more through overtime, expedited materials, and mistakes. For ranges, see our 2026 price guide for load bearing wall removal in Dallas.
Can you do it yourself to save time?
Almost never. A first time DIY job usually takes longer, not shorter, because the engineering, permit, and shoring still have to happen, and a homeowner has to learn them from scratch. Our guide on removing a load bearing wall yourself explains why.
Questions to ask your contractor about timing
- What is your realistic timeline from today to a finished space, not just the construction days?
- Who handles the engineering and permit, and how long do you expect each to take?
- Do you order materials before or after permit approval?
- How many days will my kitchen, living room, or main living area be affected?
- What could cause delays on a home like mine?
- Do you handle finish work, or will I need another contractor?
Good answers are specific. Vague answers like “we’ll get it done fast” are a sign the plan may not be fully thought through.
Frequently asked questions
How long does it take to remove a load bearing wall?
The physical removal and beam installation usually takes 2 to 5 working days. The whole project, including engineering, permitting, materials, inspection, and finishing, typically takes 4 to 8 weeks.
How long does it take to remove a load bearing wall in a two story house?
Expect the construction phase to run 3 to 5 days or more, and the full project to take roughly 6 to 8 weeks, because engineering and shoring are more involved.
Why does the permit take so long?
The city reviews engineered plans on its own schedule, and review times depend on workload and the completeness of the application. A complete, correct submission is the best way to avoid delays.
Can load bearing wall removal be done in one day?
The demolition and beam install on a very simple wall can sometimes happen in a day, but the total job still includes shoring, connections, cleanup, inspection, and finishing, so plan for several days of on site work at minimum.
How long does the engineering take?
Simple projects often take a few days to a week or two. Complex homes, long spans, or foundation concerns can take longer.
Does a steel beam take longer than an LVL beam?
It can. Steel often needs fabrication and may have a longer lead time. LVL beams are commonly available more quickly, though very long or heavy members may also need to be ordered.
How long before I can use the room again?
Often you can use the space during finishing, but it may feel unfinished until drywall, paint, and flooring are done. Most homeowners are fully settled in within a week or two after the structural work passes inspection.
What can delay a wall removal project?
Permit corrections, material lead times, hidden problems inside the wall, foundation issues, changes to the plan, and weather or scheduling conflicts are the usual causes.
Do I have to be home during the work?
You do not need to be there constantly, but you should be reachable for decisions and available for key steps such as final walkthroughs and sign offs.
How can I get the fastest timeline without cutting corners?
Finalize your layout early, choose finishes before work begins, hire a contractor who handles engineering and permits in house or with a reliable partner, and respond quickly to questions. Those steps save more time than any shortcut.
Bottom line
If someone tells you load bearing wall removal takes three days, they are describing one phase. The real answer is that the work in your home is quick, but the planning around it is what makes it safe, legal, and clean. Most Dallas Fort Worth homeowners should plan on roughly 4 to 8 weeks from first call to a finished open space, and more if the project is complex.
If you want a timeline specific to your home, we will walk the space, explain the steps in plain language, and give you a realistic schedule before you commit to anything. Learn more about our wall removal service, consider load bearing wall moving if shifting a wall fits your plans better, see the areas we serve, or contact us for a free estimate. You can also call 972-640-6090.